Read the finding. Understand the advice.

Inside Your WHBC Survey

Explore an illustrative WHBC report and see how survey findings are explained. Select a photograph to understand the observation and the recommended next step.

Illustrative specimen report

The property and findings in this example are fictional.

WHBC SPECIMEN 001

WHBC Building Survey Report

The property

Example House

A building report should help you decide what to do next.

The displaced roof tile warrants priority repairs. Local masonry work and relaying the raised garden path slab can be included in the planned external repairs. The ceiling stain needs investigation to establish its source before decoration. The untested electrical installation and boiler require specialist assessment before any repair needs can be established. No current repair is indicated for the visible bedroom joinery or accessible roof timbers within the stated inspection scope. The action summary brings the recommendations together, with the timing explained in each finding.

15 findings in this specimen. These figures summarise recommendations, not a whole property rating.

Illustration of plain clay roof tiles with one displaced tile, a brick chimney with weathered mortar and staining below a black gutter joint.
Illustrative imageFront roof slope, chimney and gutter joint.

Select a numbered marker to read the related finding.

About Example House

Example House is a fictional detached house of two storeys, assumed to date from around 1930. Its external walls comprise red brick cavity masonry. The gabled roof is covered with plain reddish brown clay tiles and has one brick chimney. Black half round gutters collect roof water. The windows are white painted timber casements. Suspended timber floors are assumed at the front of the ground floor, with an assumed solid floor to the rear utility room. The roof has a traditional timber structure. A paved garden path leads to a timber gate.

Inspection context

This specimen assumes a visual inspection from accessible ground positions and within accessible rooms. The roof space is viewed from an accessible hatch; low areas and concealed timber bearings remain outside the view. No roof or floor coverings are lifted and no opening up is undertaken. The electrical installation and gas boiler are considered visually only, without operation or testing. No service records are assumed to have been provided. These assumptions explain the scope of the example and do not record an actual visit.

See how this advice could support your own property decisions.

Request a survey quotation

How to read the action labels

Urgent action

Immediate precautions or urgent assessment where delay could have serious consequences.

Priority repairs

Work to address reasonably soon because deterioration or consequential damage could continue.

Planned repairs

Defects requiring repair that can reasonably be included in a planned programme.

Routine maintenance

Regular upkeep intended to preserve the element’s condition.

No current repair indicated

No specific repair recommendation arises from the accessible parts inspected.

Further investigation required is a separate flag. It identifies information or assessment needed to resolve an uncertainty. Where this flag appears, the suggested timing applies to the assessment first. Any repair needs must be established from its findings.

The labels organise this specimen’s recommendations. They are not a certification of the building’s condition. Inspection status is recorded separately; an untested or concealed element is not treated as satisfactory.

Consolidated action summary

Read each finding alongside its recommended action and inspection context.

Urgent action 0

No findings in this category within this specimen.

    Priority repairs 4

    1. Arrange early attention, preferably before the next period of heavy rain or strong winds.

    2. F08 Pale staining to the bedroom ceilingFurther investigation required

      Clarify the cause early, before planned decoration or a purchase commitment that depends on the repair scope.

    3. F11 Electrical installation and test recordsFurther investigation required

      Arrange early, preferably before a purchase commitment, so the results can inform the decision and any repair planning.

    4. F12 Gas boiler and service historyFurther investigation required

      Arrange early and before relying on the boiler for occupation where its recent maintenance cannot be verified.

    Planned repairs 6

    1. Include in the planned external repairs and coordinate access with the roof tile work where practicable.

    2. Arrange with the next gutter maintenance visit, bringing this forward if overflow or fresh wetting is seen.

    3. Plan the local work within the next suitable season for external masonry repairs.

    4. Clear accessible loose debris soon and include the ventilation check in the planned external work.

    5. Arrange before regular bathing or shower use allows repeated wetting of the open joint.

    6. Include in the planned external repairs, coordinating with other garden work where practical.

    Routine maintenance 3

    1. Include in the next external decoration cycle, using a dry period suitable for the chosen coating.

    2. Record initially, review over the following months and investigate earlier if a clear change occurs.

    3. Include in routine garden maintenance during suitable dry weather.

    No current repair indicated 2

    1. No immediate repair programme is indicated; review during ordinary occupation and decoration.

    2. No immediate timber repair is indicated; arrange the separate stain investigation in accordance with F08.

    White Horse Building ConsultancyExample House · Illustrative specimen